A growing number of Macomb County homes carry a solar array on a roof that is quietly aging underneath it, and the two projects, roofing and solar, do not talk to each other unless a homeowner makes them. This page is purely the roofing side of that conversation: the sequence that avoids paying to remove and reinstall panels twice, how a remove-and-reset actually happens on the day, the flashing detail every mount penetration needs, and what happens to your new roof's warranty when a solar installer's hardware goes back through it. We are leaving solar economics, incentives, and payback math to the solar companies. This is the logistics of doing both projects once, correctly.
01 / THE SHORT ANSWERReplace the roof before the panels, not after
The rule that avoids the most regret is simple: the roof under a solar array should be newer than the array itself, ideally by a comfortable margin. A rack-mounted solar system is commonly expected to run for decades, and a roof that only had a few years of life left when the panels went up will need to come out from under them well before the array is due for its own replacement. When that happens, someone has to detach the array, store it, replace the roof, and reinstall it, and that detach-and-reinstall labor is money that a homeowner who sequenced the two projects in the right order never has to spend at all.
is the standard installed range for an asphalt roof replacement in Macomb County, most homes landing $12,000 to $16,000, before any solar remove-and-reset labor is added on top. Run your own roof size through the cost calculator for a ballpark, then get the exact number from a free inspection.
If you already have panels installed and the roof underneath is getting old, the honest move is a free inspection now rather than waiting for a leak to force the decision on someone else's timeline. If you are shopping for solar and your roof is more than a decade old, ask the roofing question before you sign anything with a solar company: get the roof looked at first, and if it needs replacing, do that first. Nearly every reputable solar installer will tell you the same thing, because nobody wants to detach a brand-new array a year after it goes up. Our roof replacement service page covers the general process and price ranges this guide builds on.
02 / THE SEQUENCEWhy roof age has to come first
The logic is not complicated, but it is easy to skip when a solar quote is exciting and a roof inspection is not. A solar array is a structure bolted through your shingles into your rafters, and every one of those mounting points is a controlled penetration that has to stay sealed for the life of the installation. Once the array is up, your roofer's access to the shingles under and around it is blocked by hardware that is expensive and slow to move. A roof replacement done around an existing array, rather than before one goes up, costs more, takes longer, and carries more risk of a mount getting reinstalled slightly off from its original, tested seal.
The math homeowners actually face
Picture a roof that is 14 or 15 years into its life when a solar array goes on top of it. Depending on the shingle and the exposure, that roof may have a handful of good years left, or it may already be showing granule loss and curling at the edges an inspector would flag today. Either way, the clock on the roof did not reset when the panels went up. If the roof needs replacing in year three or four of owning the array, the homeowner is paying for a full remove-and-reset on top of the roof itself, a cost that a roof replacement done first would have avoided entirely.
What a pre-solar roof inspection actually answers
A free inspection before you install solar covers the same ground as any pre-replacement inspection: shingle condition, flashing, ventilation, and the attic side of the deck. The output is not a guess. It is enough information to tell you whether your current roof has the years left to comfortably outlast the array you are about to bolt to it, or whether the smarter order is roof first, solar second. That single decision, made before any hardware goes up, is the cheapest form of solar-roofing coordination there is.
03 / THE DAY OF WORKHow a remove-and-reset actually works
When a roof under an existing array does need replacing, the job splits into two coordinated pieces handled by two different trades. The typical division of labor has the solar installer detach the array, disconnect and cap the electrical, and store the panels and racking safely off the roof for the duration of the tear-off and install. The roofing crew then has a clear deck to tear off, replace decking as needed, and install the new roof system, including new flashing at every point where a mount will return. Once the roof is complete, the solar installer comes back to reset the racking, reattach the panels, and reconnect the system, ideally onto newly installed, correctly flashed mount points rather than the original penetrations.

The coordination burden is real and it sits mostly with the homeowner unless one contractor is willing to schedule around the other. In practice this means locking a date with your roofer, confirming the solar installer's crew can detach on that date or the day before, and building in a buffer day between detach and the roofer's tear-off in case weather pushes the roofing schedule. A homeowner who calls only the roofer and assumes the solar company will simply show up on the right morning is the most common way a remove-and-reset schedule falls apart.
Remove-and-reset labor for the array itself is priced and billed by the solar company or a licensed solar installer, not by us, so we will not quote a figure here that we cannot stand behind. What we can tell you is the roofing side stays inside the standard installed ranges above, because tearing off and replacing the shingles under an array uses the same materials and mostly the same labor as any other reroof, with the added care of protecting and later re-flashing the mount locations.
04 / THE DETAIL WORKMount flashing: the detail that decides if this stays dry
Every solar mounting point is a hole through your shingles and into your rafters, and every one of those holes needs to be sealed as carefully as a chimney or a plumbing vent, arguably more carefully, because a mount carries real structural load in wind. The correct approach uses a dedicated flashing base at each mount foot, installed under the surrounding shingle courses the same way step flashing goes under siding, so water sheds over the flashing rather than pooling around a bolt sealed only with caulk on top of the shingle.
This is exactly the kind of penetration that shows up in our complex roofline guide as a place water tries hardest to get in: anywhere something goes through the shingle field is a seam, and seams fail before flat fields do. On a remove-and-reset, this is the moment to get it right, because the roofer has full access to the deck and the flashing before the array goes back on. Sealant-only mounting, without a proper flashed base underneath, is the shortcut that shows up as a leak two or three winters later, usually traced right back to a mount foot.
05 / THE WARRANTY QUESTIONWarranty interactions when a third party penetrates your roof
A new roof typically comes with two layers of coverage: the shingle manufacturer's material warranty and the installing contractor's workmanship warranty. Both can be affected when a separate company, the solar installer, later penetrates the roof to mount or reset an array. Manufacturer warranties commonly address who is allowed to alter the roof system and under what conditions coverage continues, and workmanship warranties from the original roofer often narrow once someone else has opened up the shingles the roofer sealed.
Ask your roofer, in writing, whether your workmanship warranty stays intact after a solar company installs or resets mounts on the roof, and ask the solar installer for their own warranty on the mounting and any leaks traced to their penetrations. Manufacturer and installer policies vary, and we would rather point you to the actual document than guess at terms that may not match your shingle line.
The practical takeaway is not to avoid solar, it is to sequence and document the work so nobody can later blame the other trade for a leak. Photograph the roof before the array goes up or comes back down, keep both warranty documents, and ask each contractor directly what happens to their coverage once the other company's hardware is on the roof. A reputable roofer and a reputable solar installer will both answer that question plainly instead of talking around it.
06 / SHOPPING NOWIf you are shopping for solar today
For homeowners currently getting solar quotes, the advice from this page compresses to one step: before you sign anything, get your roof looked at. Our inspection is $0 with no obligation, and if the roof has the years left to comfortably outlast the array, you get a clean bill and can move ahead with solar with confidence. If the roof is closer to the end of its life, replacing it first means the solar installer mounts into brand-new shingles and fresh flashing, and you never pay for a remove-and-reset at all. Either answer is useful, and both come from the same free visit.
Our preparing for a roof replacement guide covers the general homeowner checklist for a reroof, and our replacement process guide walks the day-by-day sequence a crew follows on any tear-off. If your roof also has skylights near where an array sits, our replacing skylights during a roof replacement guide covers that coordination too. None of these are solar-specific, but the sequencing logic, get the roof right first, is the same one this page argues for.
A remove-and-reset is not a punishment for having solar. It is what happens when the roof and the array were never sequenced in the first place.
- The roof under a solar array should be newer than the array; sequence roof replacement before installation whenever the roof is aging.
- Remove-and-reset splits the work: the solar installer detaches and later resets the array, the roofer tears off and installs the new roof in between.
- Every mount point needs proper flashing under the shingle courses, not sealant alone, the same principle as any other roof penetration.
- Get both the shingle manufacturer's and your roofer's warranty terms in writing before a third-party installer penetrates a new roof.
- A free inspection before you sign a solar contract tells you whether your roof has the years left to skip a remove-and-reset entirely.
Questions we hear most
Before, whenever the roof is more than about a decade old or showing wear. The roof under an array should comfortably outlast it, and replacing first means the solar installer mounts into new shingles and fresh flashing rather than an aging roof that will need a costly remove-and-reset a few years later.
Typically the solar installer detaches, disconnects, and stores the array, then the roofing crew tears off and installs the new roof, and the solar installer returns to reset the racking and reconnect the system. Confirm this division and the schedule with both companies in writing before work starts.
It can affect coverage, which is why you should get both your roofer's workmanship warranty terms and the shingle manufacturer's policy on alterations in writing before a solar company penetrates the roof. Terms vary by manufacturer and contractor, so ask for the actual document rather than assuming.
The roofing portion stays inside the standard installed range of $9,000 to $18,000 for asphalt, most homes $12,000 to $16,000, with remove-and-reset labor for the array itself priced separately by the solar company. A free inspection gives you the roofing number; your solar installer quotes the panel side.
- FEMA, disaster declaration DR-4757-MI, Michigan severe storms of August 2023 (Macomb County designated). fema.gov/disaster/4757
- Manufacturer technical and warranty literature for the major asphalt shingle lines: GAF (gaf.com), Owens Corning (owenscorning.com), and CertainTeed (certainteed.com).
- InterNACHI Standards of Practice for home inspections (scope of a generalist roof inspection). nachi.org/sop